Fresh plaster whether applied as a patch or to the entire wall must dry completely before tile is applied.
Tiling on heavy gypsum plaster wall.
Apply the last layer of skim coat and use a medium sized sandpaper to achieve a rough texture.
It is believed that the cement sand mortar dries at a speed of 1 cm in 7 days.
Make sure that gypsum board plaster board is strong enough to support the load from tiles and adhesive.
The drying time is also affected by the thickness of the plaster layer.
Holes or cracked plaster requires patching.
Expected load for tiling onto gypsum board should not exceed 32 kg m2.
Recommended thickness of the board is at least 12 5 mm.
If you re not sure if you have lead paint test kits are available.
Tiling over damp plaster causes the wall to fail because the plaster won t become strong if it can t dry out.
What this means for your installation is once it has been determined the gypsum board and its supporting structure have been properly designed constructed and installed to support a tile installation consult your setting material manufacturer to determine which of their adhesives or mortars and possibly primers are recommended to bond the tile to the painted gypsum substrate.
You should not tile over wallpaper glossy surfaces lead paint or plywood.
The adhesive and tile will block moisture from evaporating.
Preparation for tiling onto plasterboard plasterboard should be dry securely fixed and rigid with no protruding fixings with the face to receive decorative finishes exposed.
Once it s ready for tiling there is no need to tape the joints.
Fresh plaster needs up to a month for the material to set in and fasten.
Don t try to use the tile setting adhesive or drywall joint compound to patch plaster walls.
It is needed for the adhesive to bond well.
You may tile over existing tile painted or unpainted drywall plaster and textured walls.
Laying of tiles on gypsum plaster is carried out in 7 14 days.
Tiling onto plasterboard walls.
It should be a minimum 12 5mm thick when fixed to timber framing or battening and fixed in accordance with the manufacturers recommendations.
If you have a tiling job to do in your bathroom and the walls have been skimmed with plaster you have to follow a few guidelines when installing tile to make sure you do not have a failure resulting in all the tiles coming off the wall.
Firstly check the condition of the plaster skim it should be fully dried out and a light pink colour.
However tiling over tile can add quite a bit of thickness so make sure your wall can handle the weight.