Set the tiles by gently sliding into place.
Tiling concrete steps.
Step 1 choose the type of tiles.
After you have spread the tile adhesive on the floor by using the straight side you have to comb it with the notched side.
Then let the mortar stand for about 10 minutes to get tacky.
Tiling your concrete steps can help to make your stairs more beautiful and decorative.
Use spacers to achieve consistent gaps between tiles image 2.
There are many different types of tiles that can be used on concrete steps.
Please call 614 464 7899 online prices may vary from in store pricing.
Place a tile over the mortar and push it down until it sits flat against the stairs.
Put grout spacers in between each tile to leave areas for the grout to be added later.
Add just enough water to get the dry mixture wet and begin mixing.
You ll need to treat every step individually tiling each one completely as you go and working down from the top stair to the bottom.
Let the primer dry and then apply the membrane photos 3 and 4.
Making sure to follow manufacturer s instructions allow the membrane to cure.
Continue to mix until the texture is creamy.
Pour just about an entire bag of the dry mixture into a large bucket.
Cut the membrane so it s 1 1 2 times the width of your tiles.
When tiling the steps start with the risers.
This will give you a really tight connection to your slab.
Spread a layer of isolation membrane over the concrete using a notched trowel.
How to tile stairs.
Use spacers to achieve consistent gaps between tiles.
Use the flat side of trowel to apply the thin set and the comb edge of the trowel to create grooves image 1.
Spreading tile adhesive with a float.
When tiling the steps start with the risers.
A good tiler will want to use the stick fast qualities of a mortar mix before they diminish.
Tiles meant for indoor use will not work when tiling concrete stairs outdoors.
Use a self mix thin set mortar for the tile installation.
If needed use the tile cutter to cut any tiles to the proper size.
Don t wait longer than 15 20 minutes after you ve finished spreading.
Then prime the concrete see photo 2 with the recommended solution consult the membrane manufacturer s literature.
Skip this step and we guarantee your new tile will crack right over the cracks in the concrete.
You should smooth the surface of the membrane using the flat edge of a trowel.
Apply the tiles to the face of a vertical step riser lining up the upper edge of the tile flush with the edge of the horizontal stair tread and using the mastic trowel to apply mortar to the back of the tiles.
Step 5 place the tiles in order.